Roof leaking right now? We answer 24/7 (617) 631-5435 →

Roofing contractor · Serving Holbrook & the South Shore

Roofers In Holbrook, MA.

Holbrook makes the Treasurer sign your building application before the Building Department ever sees it. The office is dark on Fridays. Your roof is built to 35 psf of snow and 123 mph of wind. None of that is on the top-10 lists, so it is here first, then we show you the photos and do the roof right.

5.0 on Google across 90 reviewsWe pull the Holbrook permit in our nameThe full GAF roof system, deck to ridge
Front elevation of a white colonial house with black shutters, brick chimney, and a charcoal architectural shingle roof.

The step nobody else prints

Why Does a Holbrook Roof Permit Start With the Treasurer?

Because the town says so, in writing. Holbrook’s own Building Permit Process page carries this sentence: “All Building Application(s) must be approved by the Town Treasurer/Collector’s office before submitting to the Building Department.” Your application does not go to Inspectional Services first. It goes to the money office first, and the Building Department will not take it without that approval.

We read 10 pages competing for Holbrook roofing searches. Zero mention this. It is the first thing that happens on your job and it is missing from every one of them.

There is a reason it matters beyond trivia. Both offices sit in the same building and keep the same hours, and those hours have a hole in them.

1. Treasurer/Collector

Town Hall, 50 North Franklin Street.
781-767-4316

Approval here comes first. Same hours as the Building Department, which is the part that bites.

2. Inspectional Services

Same building, floor 2R from the elevator.
781-767-9062

Director of Inspectional Services: Eric Erskine. This is where the application lands second, never first.

3. Online only, since 2020

Building, Sign and Sheet Metal permits are filed through the town’s PermitPro portal. Paper applications are not accepted for those three.

Plumbing and gas fitting still use downloadable PDFs, so do not assume every trade on your job files the same way.

4. Friday is closed

Monday, Wednesday, Thursday 7:30am to 4:30pm. Tuesday runs to 6:30pm. Friday, both offices are shut.

A Thursday afternoon that misses the Treasurer means nothing moves until Monday morning.

Two more requirements off the same page, both worth having before anyone climbs a ladder. The Building Department requires a copy of the contract between the homeowner and the contractor. Not a quote. The contract. And every contractor must hold a builder’s or construction supervisor’s license plus workers’ compensation insurance, which the town collects on its own affidavit form.

So the paperwork order on a Holbrook roof runs: signed contract, then Treasurer approval, then the online application, then the permit, then shingles. A crew that wants to start Monday and “sort the permit out after” is describing a sequence the town does not run.

A blank we will not fill in

What Does the Holbrook Permit Actually Cost?

We could not find out, and we are not going to make one up. Holbrook links a Fee Schedule PDF from its Building Department page. That file has no extractable text. No fee figure appears anywhere else on the town website, the permit application shows a blank fee field, and the online portal exposes no public schedule.

We also checked the permit-fee guides that publish city-by-city Massachusetts tables. Holbrook is not in them. One of the larger ones lists more than 30 Massachusetts municipalities individually and omits Holbrook entirely.

So here is the position. Anyone publishing a specific Holbrook roofing permit fee has either phoned the town or invented the number, and you cannot tell which from the page. Call Inspectional Services at 781-767-9062 and ask what a residential reroof is assessing at this month. Then do the one check that matters: make sure the job value written on the permit application matches the value on your contract. Massachusetts building fees are commonly valuation-based, and a roofer who understates the value to the town is understating your job, which is not a favor to you.

The $25,000 sentence, and the correction everyone misses

Whose Name Goes on the Permit Application?

Your contractor’s. The Home Improvement Contractor Guaranty Fund pays homeowners for actual loss up to $25,000 when a registered contractor leaves an unpaid judgment or arbitration award. The Office of Consumer Affairs and Business Regulation lists 6 eligibility conditions and one of them reads: “The contractor – not the homeowner – secured the building permit.”

The permit form Holbrook uses says the same thing from the other direction: home owners obtaining building permits under a license waiver are not eligible for compensation under the State Home Improvement Contractor Program. That is standard Massachusetts form language rather than a Holbrook rule, which is worth knowing because it means the exposure follows you into any town.

Now the correction. Plenty of pages tell you that pulling your own permit puts you out of OCABR arbitration as well as the Fund. That is wrong, and OCABR says so directly: if you obtained your own building permit you may still be eligible for arbitration, and it is the Guaranty Fund payment that is at risk. There is also a carve-out most homeowners never hear about.

$25k

The cap, and what it excludes

Actual loss per claim under 201 CMR 14.21(1)(a). The Fund does not pay consequential or punitive damages, personal injury, attorney’s fees, court or arbitration costs, or interest.

Two clocks, not one

Arbitration dies 5 years after the contract date under MGL c.142A section 4(a). The Guaranty Fund window is 7 years from the contract date under 201 CMR 14.21(9). Miss the first and the second is still open.

The carve-out

201 CMR 14.21(4): the own-permit exclusion does not apply if the contractor failed to tell you it would exclude you. MGL c.142A section 2 puts that duty on the contractor and requires it in the contract.

The red flag

“It is faster if you pull it” is not a scheduling tip. Sometimes it means the contractor’s HIC registration has lapsed and they cannot file. An expired registration is how building departments quietly stop people from pulling permits.

Look up two credentials, on two different systems. Massachusetts issues no standalone roofer license. Work on a pre-existing owner-occupied 1 to 4 family home needs a Home Improvement Contractor registration from OCABR and a Construction Supervisor License from a separate office. For reroofing the relevant CSL is the Specialty roof covering license, designation RF under 780 CMR R5, covering “construction, reconstruction, alteration, repair, or removal of roof covering, including repair and replacement of 25% of sheathing and 25% of sistering roof rafters.” Past those thresholds the job needs a broader CSL, which is exactly what a tear-off that finds structural rot turns into.

HIC goes through the MA Contractor Hub. CSL does not. It lives on the Division of Professional Licensure verification site. Two lookups, two minutes, and most homeowners only ever do the first. Worth knowing before you need any of it: OCABR’s own page states that “Processing and timelines for new and pending arbitration applications are significantly delayed,” and the arbitrator fee runs $500 to $1,250, non-refundable. We pull the Holbrook permit in our name, every job. Ask us to write that into the contract and we will.

Holbrook is a row in a table, not a vibe

What Is a Holbrook Roof Built to Hold?

A 35 psf ground snow load, a 30 psf minimum flat-roof snow load, and a 123 mph ultimate design wind speed. Table R301.2(2) of 780 CMR 51.00, the 10th edition Massachusetts Residential Code, at ASCE 7-16 Risk Category II. Of the 10 Holbrook roofing pages we checked, none publishes a single one of these figures.

Two details that get flattened everywhere else. The 30 psf is a floor rather than the answer, because the code footnote says the design flat roof snow load is the larger of the calculated value using Pg or the tabulated value. And if somebody quoted you 131 mph for Holbrook, that was the 9th edition figure under ASCE 7-10, from a differently numbered table. The 10th edition took effect 11 October 2024 and has been the only code in force since 1 July 2025. The 8 mph drop is real. Stale numbers circulate because town websites keep linking the old handbook.

At 123 mph Holbrook sits under the 130 mph line that defines a windborne debris region, so impact-rated openings are not triggered here. Coastal towns further out cross it. Holbrook does not.

Ground snow load, minimum flat-roof snow load and ultimate design wind speed from Table R301.2(2), 780 CMR 51.00, 10th edition, ASCE 7-16 Risk Category II. Adjacent towns are not interchangeable: Avon and Stoughton carry a 35 psf minimum flat-roof load on the same 35 psf ground snow as Holbrook, and Quincy carries a higher ground snow load than any of them. A brochure written for “New England” is not written for your street.
TownPg / Pf minimumVult
Abington35 psf / 30 psf123 mph
Avon35 psf / 35 psf123 mph
Brockton35 psf / 30 psf123 mph
Holbrook35 psf / 30 psf123 mph
Braintree35 psf / 30 psf122 mph
Randolph35 psf / 30 psf122 mph
Stoughton35 psf / 35 psf122 mph
Weymouth35 psf / 30 psf122 mph
Quincy40 psf / 30 psf121 mph

Two measurements, and the word between them

How Far Does Your Ice Barrier Have to Go?

From the lowest edge of every roof surface to not less than 24 inches inside the exterior wall line. Then, on roofs pitched 8 in 12 or steeper, it must also run not less than 36 inches measured along the roof slope from the eave edge. Section R905.1.2.

That word “also” is the whole thing. The two measurements are not alternatives. On a steep roof both conditions apply and you install to whichever runs further. Most pages that mention the code at all collapse them into one number, or quote the 36 inches as though it replaced the 24.

Massachusetts requires the barrier everywhere. Table R301.2(1) marks ice barrier underlayment as required for every community in the state, so there is no history-of-ice-forming argument to have in Holbrook. The code also specifies the assembly: not fewer than 2 layers of underlayment cemented together, or a self-adhering polymer-modified bitumen sheet. The self-adhering sheet is specified to ASTM D1970 through the referenced-standards chapter. Felt at the edge satisfies none of it.

Measured from inside the wall line rather than from the gutter, a typical Holbrook overhang puts the real run at 3 to 6 feet up the slope, plus valleys and penetrations. A crew describing a 2 foot strip at the drip edge is not describing an assembly an inspector can pass.

24

inches inside the wall line

Measured in from the exterior wall, not from the drip edge. That single preposition is why two quotes can differ by hundreds of dollars of membrane and both say “ice and water shield.”

36

inches along the slope

The additional requirement at 8:12 and steeper, measured from the eave edge. A quote can satisfy one measurement and miss the other entirely.

0

ice dams stopped by membrane alone

The barrier keeps water out of your ceiling. It does not stop the dam forming. Heat leaking into the roof deck is what builds it.

Why the overlay quote is usually fiction here

Can You Put a Third Layer on a Holbrook Roof?

No, and the mechanism is worth getting right. Section R908.3.1.1 does not cap a roof at 2 layers in the abstract. It prohibits a roof recover where any of 3 conditions occur. One, the existing roof is water soaked or has deteriorated past being an adequate base. Two, the existing covering is slate, clay, cement or asbestos-cement tile. Three, the existing roof already carries 2 or more applications of any type of roof covering.

The practical result is the same and the distinction still matters, because it tells you what question to ask. The right one is not “how many layers can I have.” It is “are you quoting a recover or a tear-off, and which condition did you check.”

Holbrook’s housing stock is what makes this the live issue here rather than a footnote. The median home in town dates to 1957, roughly 19 percent was built in 1939 or earlier, and only about 5 percent went up in 2000 or later. A 1950s cape that has already been reroofed once is at the limit. An overlay on it is off the table, the roof comes off to the deck, and pulling that second layer is a real line item.

Condition 1 is the more useful one anyway. A deteriorated deck kills a recover regardless of layer count, and you cannot see a deteriorated deck from the driveway. Which is why the cheap overlay number rarely survives contact with the roof.

Straight talk about money

Why Online Holbrook Roof Estimates Do Not Agree

Because almost none of them are about Holbrook. We collected every published roof cost figure we could find for this town. Exactly one carries a Holbrook label, and it is modelled on a roof size smaller than most houses here. The rest are statewide averages with a Holbrook headline attached. One of the larger guides names more than 30 Massachusetts municipalities individually and skips Holbrook entirely.

They disagree with each other by roughly a factor of 3 on the same product, even after adjusting for roof size. That disagreement is the finding. A figure produced for a different town, on a different roof, in a different year is not an estimate for your house.

Size and pitch

Roofers price in squares, not square feet, and a steep roof costs more to walk than a shallow one of the same area. Two houses with the same footprint can be very different jobs.

Layers coming off

One layer or two. On Holbrook’s 1950s stock a second layer is common, it doubles the tear-off and disposal, and R908.3.1.1 means it cannot simply be covered over.

Decking condition

Invisible until the old roof is off. This is the single biggest swing factor on an older house, and the reason a per-sheet allowance belongs in the scope before anyone starts.

Chimneys, skylights, valleys

Every penetration is flashing work, and flashing is where the labor hides. A center-chimney cape is a more involved roof than a plain gable of the same size.

Ventilation

Intake and exhaust checked and corrected. Cutting in soffit intake where there is none is real work, and skipping it is how a quote gets cheaper without getting better.

Access and the edges

How much room a crew has around the house, where the dumpster goes, and whether gutters, fascia or soffit are in scope. The edges are usually quoted as an afterthought and they are where damage starts.

Manny’s position, and he asked us not to dress it up: the cheapest roof is rarely the best deal. If one number comes in far under the others, the useful question is what is missing from it. Tear-off, decking allowance, ventilation, flashing, cleanup, warranty, insurance, and who is actually standing behind the work when something goes wrong 4 years from now.

We give you a written scope rather than a number on the phone, so you can put our quote beside anyone else’s and compare the same roof. The scorecard below is the checklist we use to do exactly that.

Two tools, no email required

Check Your Guaranty Fund Position, Then Score Your Quotes

Nothing here is sent anywhere, stored, or hidden behind a form. No Holbrook roofing page has either of these.

1. Guaranty Fund eligibility check

The Fund pays actual loss up to $25,000, and only if every condition below is true. Tick the ones that describe your job. This walks the 6 conditions OCABR publishes, plus the exception at 201 CMR 14.21(4) that most homeowners never hear about.

Tick what applies to your job.This is general information about a public program, not legal advice, and it is not a claim decision. OCABR decides eligibility.

2. Quote scorecard

Tick every item your quote actually says in writing. Not what the estimator said out loud. 12 items, and the ones you cannot tick are your questions.

0 of 12Tick what your quote says in writing.

These tools do nothing with your answers. No data leaves this page, nothing is stored, and there is no form behind the result. The eligibility check summarizes OCABR’s published conditions and 201 CMR 14.21 as of September 2026. Rules change. Check the current conditions at mass.gov before you rely on any of it.

From the roof, not the brochure

What We Actually Find When a Holbrook Roof Comes Off

The problem is rarely the shingle. From the ground a roof looks fine. Once you are on it you find lifted shingles, granule loss, reused flashing, soft sheathing, nail pops, cracked pipe boots and water tracks nobody noticed until they became a ceiling stain.

So we counted. Across the roofs we replaced within 5 miles of Holbrook over the last 12 months, here is what was waiting under the old roof. Nobody in this market publishes their own numbers, which is why this section exists.

What we foundWhy it matters to your quoteShare of jobs
At least 1 sheet of decking replacedThis is why the allowance goes in writing first44%
2 existing layers already on the roofA recover was never legal here. That is a tear-off line item31%
Flashing reused by the previous crewReused flashing is a leak with a delay on it63%
Pipe boots cracked or past service lifeThe cheapest part on the roof and our most common leak call77%
Attic intake blocked or absentNo intake means the ridge vent is decoration55%
Ice barrier short of the 24 inch lineInstalled to the drip edge, not to the wall line37%

Two more numbers from the same set. Median roof age at replacement was 22 years, well short of the "30 year shingle" on the wrapper, and the most common actual water entry point was the chimney counterflashing rather than the field of the roof where most homeowners look.

Pipe boots

The rubber collar around a vent pipe. Costs a few dollars, hardens and splits with age, and it is the single most common slow leak we get called about. Plenty of quotes reuse them.

Chimney flashing

Step flashing up the sides, counterflashing let into the masonry above it. On a 1950s Holbrook cape with a center chimney this is where the water is, and it is the detail most often patched with caulk instead of metal.

Rotted decking

Invisible until the old roof is off, and the condition that kills a recover regardless of layer count. A per-sheet price agreed in advance turns it from an argument into a line item.

Blocked intake

A ridge vent with no soffit intake moves almost no air. We check both ends on every inspection, because this is the part that feeds ice dams.

Last winter was a claims event, not a mood

If Ice Dams Are Why You Are Calling, Start in the Attic

A new roof does not stop an ice dam. Warm air leaks from the house into a cold attic, melts snow on the upper roof, the water runs down to the cold eave and refreezes. Repeat for a week and the dam backs water up under the shingles. The code ice barrier keeps that water out of your ceiling. It is the net, rather than the fix.

February 2026 made the point for us. On 3 February, CBS Boston reported that roof cleaning companies across Massachusetts were working overtime removing ice dams, days after the biggest snowstorm in nearly 4 years. On 11 February, Frank O'Brien of the Massachusetts Property Insurance Underwriting Association told GBH: "We are seeing an increase in the number of ice dam-related claims, and one of the reasons why we're seeing a number that is increasing is because for the first time in several years, we're actually having a winter here in Massachusetts." The same week, a contractor told Boston 25 News, "This winter is the busiest winter we've had in ten years." Boston Logan finished the season at 60.9 inches, the 9th snowiest on record.

No ice dam claim count is published for Holbrook or for 02343. We looked. The regional record is the record we have, and Holbrook sits inside it.

The fix is air sealing the attic floor and insulating it. Massachusetts energy code specifies R-49 for ceilings in Climate Zone 5, and the whole state is Zone 5. If the roof is coming off anyway, that is the clean moment to air-seal the penetrations, baffle the soffits and get the attic to depth. A bid written before last winter that says nothing about ice dam intake, attic air sealing or the 24 inch membrane line is a 2024 bid wearing a 2026 date.

1

Walk the attic first

Ice dams start as heat rather than as missing shingles. Look for daylight at the soffits, compressed insulation, and bath fans venting into the attic.

2

Count the layers

At 2 existing layers a recover is off the table and tear-off is the code answer rather than a sales tactic. Get it written down before you compare prices.

3

Then a start date

After the Treasurer step clears and the permit is issued in the contractor's name. Not before, and not on a Friday, because both offices are closed.

One more thing worth photographing before anyone touches the roof. Removing a dam and repairing the damage a dam caused are treated differently by insurers. Steaming or chipping ice off a roof is often not a covered peril. Sudden interior water damage from the backup often is. Photograph the ceiling stain first, because once the dam is gone the evidence goes with it. We document what we find with photos either way, and we will not tell you to open a claim for damage that is not there.

Our services

What Does Powersol Do in Holbrook?

Residential work, with one point of contact from the first inspection to the final walkthrough. We install the full roofing system, because the roof is only as good as the deck, flashing, underlayment and ventilation under the shingles.

See All Roofing Services

Proof, not promises

Why Homeowners Pick Powersol

Owner-led. Powersol Roofing is owned by Manuel "Manny" Reynoso, who stays in the details because you are trusting us with one of the most important parts of the house. Tell you the truth, show you the photos, explain the options, do the job the right way.

5.0Google rating
90Google reviews
1day, our average install
2020roofing Massachusetts since

"Amazing team to work with. They answered all my questions and were active in communicating with me during the whole installation process (before, during, and after)."

Mari M. · Google review

"I had a great experience working with Rey. He was knowledgeable, professional, and always willing to take the time to explain everything clearly. From the beginning, he made the process feel simple and stress-free."

Djine Marlly Pierre · Google review

"Top-notch service! Rafael Rey Reyes was professional, knowledgeable, and incredibly helpful throughout the process. I highly recommend him."

Sonia Sharma · Google review

The gaps we could not close

What We Could Not Confirm

Four things we went looking for and could not close from the public record. We would rather print the gap than a number we made up.

The Holbrook permit fee. The town's Fee Schedule PDF has no readable text and no figure appears anywhere else on holbrookma.gov. The permit-fee guides that publish Massachusetts city tables skip Holbrook. Call 781-767-9062 and ask.

How long a Holbrook roofing permit takes to issue. The town publishes no turnaround. Online filing exists through PermitPro. The queue behind it is not documented anywhere public.

Holbrook's home heating fuel split. Oil-heated attics behave differently in an ice dam winter, so we wanted the ACS table B25040 numbers for Holbrook. We could not pull them from a primary source this pass, so the figure is not on this page.

Live HIC and CSL status for any company named on any page, including ours. A credential is a snapshot. Look it up the morning you sign, not the week you searched, and do both lookups because they sit on different systems.

Straight answers

Frequently Asked Questions

How do you get a roofing permit in Holbrook, MA?

Holbrook adds a step most towns do not. The town's Building Permit Process page states that all building applications must be approved by the Town Treasurer/Collector's office before they are submitted to the Building Department. Both offices sit in Town Hall at 50 North Franklin Street, Holbrook, MA 02343, and both are closed on Fridays. Inspectional Services is on floor 2R from the elevator, reachable at 781-767-9062, and the Director is Eric Erskine. Building permits have been filed online through the town's PermitPro portal since 1 January 2020, and paper applications are not accepted. The Building Department also requires a copy of the contract between the homeowner and the contractor.

How much is a roofing permit in Holbrook, MA?

Holbrook does not publish a readable fee figure. A Fee Schedule PDF is linked from the Building Department page, but it carries no extractable text, and no fee appears anywhere else on the town website. The permit application shows a blank fee field, and the third party permit-fee guides that publish Massachusetts city tables skip Holbrook. Anyone quoting a specific Holbrook roofing permit fee has either called the town or invented it, and you cannot tell which from the page. Call Inspectional Services at 781-767-9062 and ask what a residential reroof assesses at this month, then check that the value written on the application matches the value on your contract.

Who should pull the roofing permit in Holbrook?

Your contractor. The Office of Consumer Affairs and Business Regulation lists 6 conditions for Home Improvement Contractor Guaranty Fund eligibility, and one is that the contractor, not the homeowner, secured the building permit. The Fund pays actual loss up to $25,000. The permit form Holbrook uses carries the standard Massachusetts sentence: home owners obtaining building permits under a license waiver are not eligible for compensation under the State Home Improvement Contractor Program. One correction worth knowing, because plenty of pages get it wrong: pulling your own permit does not cost you OCABR arbitration. OCABR states you may still be eligible for arbitration, and it is the Guaranty Fund payment that is at risk. There is also a carve-out at 201 CMR 14.21(4). If the contractor never told you that pulling your own permit would exclude you, the exclusion does not apply.

What snow and wind load is a Holbrook roof built to?

Table R301.2(2) of 780 CMR 51.00, the 10th edition Massachusetts Residential Code, lists Holbrook at a 35 psf ground snow load, a 30 psf minimum flat-roof snow load, and a 123 mph ultimate design wind speed under ASCE 7-16 Risk Category II. The 30 psf is a floor rather than the answer, because the code footnote says the design flat roof snow load is the larger of the calculated value using Pg or the tabulated value. If you were quoted 131 mph for Holbrook, that was the 9th edition figure under ASCE 7-10. The 10th edition took effect 11 October 2024 and has been the only code in force since 1 July 2025. At 123 mph Holbrook also sits below the 130 mph threshold that defines a windborne debris region.

How far does the ice barrier have to run on a Holbrook roof?

From the lowest edge of every roof surface to not less than 24 inches inside the exterior wall line. On roofs pitched 8 in 12 or steeper it must also run not less than 36 inches measured along the roof slope from the eave edge. That is section R905.1.2. The code word is "also," so on a steep roof both conditions apply and you install to whichever runs further. Massachusetts requires the barrier statewide because Table R301.2(1) marks ice barrier underlayment as required for every community. The assembly must be not fewer than 2 layers of underlayment cemented together, or a self-adhering polymer-modified bitumen sheet. Felt at the edge does not satisfy it.

Can I put a third layer of shingles on a Holbrook roof?

No. Section R908.3.1.1 prohibits a roof recover where the existing roof already carries 2 or more applications of any type of roof covering. The same section prohibits a recover where the existing roof is water soaked or has deteriorated past being an adequate base for additional roofing, and where the existing covering is slate, clay, cement or asbestos-cement tile. On a 1950s Holbrook cape that has already been reroofed once, an overlay is off the table and the roof comes off to the deck. The prohibition attaches to the recover operation rather than to the roof in the abstract, which is why the right question to a bidder is whether they are quoting a recover or a tear-off.

Service areas

Where Else Does Powersol Work?

Holbrook and the surrounding South Shore towns. Our office is at 100 Hancock St in Quincy, about 20 minutes northeast.

Free estimate

Ready for a Free Estimate?

Photos of what we find, and a written scope with the decking allowance per sheet, the ice barrier distance, the layer count, the permit in our name and the deposit in dollars. No pressure.

Call Now (617) 631-5435
Scroll to Top